GCC setup cost in India 2026: BOT vs captive and the per-engineer economics
A captive GCC in India runs $200,000 to $12M+, and a build-operate-transfer deal $800,000 to $2M over 18 to 24 months. Here is the 2026 cost breakdown across captive, BOT, and dedicated-team paths, plus the per-engineer