.NET 12 release date: November 2027 LTS and the upgrade plan from .NET 8 and 10

.NET 12 is due November 2027 as an LTS. .NET 8 is already unsupported; .NET 10 and 11 both end 14 Nov 2028. Move to 10 now, 12 in 2028.

Read time
14 min
Word count
2.2K
Sections
11
FAQs
8
Share
Two engineers compare migration cards beside a laptop and test server, with .NET 12 Migration Plan text and the .NET logo
On this page · 11 sections
  1. When is .NET 12 released?
  2. Is .NET 12 an LTS release?
  3. .NET support dates on 21 November 2026
  4. What .NET 8 end of support means right now
  5. Which path fits your app
  6. Tooling you need before you start
  7. Step-by-step: .NET 8 to .NET 10 now
  8. Step-by-step: .NET 10 to .NET 12 in 2027 and 2028
  9. India-specific considerations
  10. How eCorpIT can help
  11. References

Summary. .NET 12 is due in November 2027, and it will be a Long Term Support (LTS) release. Microsoft's support policy says a major .NET version ships every November and even-numbered versions are LTS, with three years of free support and patches, so .NET 12 should be supported until about November 2030. Microsoft has not published a .NET 12 preview, a release-notes folder or an exact launch date, so November 2027 is the published cadence, not an announced date. The dates that are fixed matter more today. .NET 8 (LTS) and .NET 9 (STS) both reached end of support on 10 November 2026, with final patches 8.0.34 and 9.0.23. .NET 11 shipped the same day as a two-year STS release, and both .NET 10 (LTS) and .NET 11 reach end of support on 14 November 2028. That gives a team on .NET 10 roughly 12 months, from November 2027 to November 2028, to move to .NET 12. Our verdict: anything still on .NET 8 should move to .NET 10 now rather than wait a year for .NET 12, and .NET 10 teams should plan the move to .NET 12 for the first half of 2028.

About this article. This is for CTOs, engineering managers and .NET developers who own production apps on .NET 8, 9 or 10 and need a support calendar and a migration plan. On 21 November 2026 we checked every release date, end-of-support date, patch number and tooling requirement against Microsoft's .NET support policy, the releases index and release notes in the dotnet/core repository, the .NET blog and Microsoft Learn. .NET 12 details rest on Microsoft's published cadence and can change; we will refresh this page when .NET 12 Preview 1 appears. This is general engineering information, and no vendor paid for inclusion. Researched with AI assistance and checked against the primary sources listed in the references.

When is .NET 12 released?

Microsoft's release policy in the dotnet/core repository says new major versions ship once a year in November at .NET Conf, and patches ship monthly on Patch Tuesday, the second Tuesday of the month. The support policy page adds that even-numbered versions are LTS and odd-numbered versions are STS. The repository policy states the same rule by calendar year: LTS releases ship in odd-numbered years, STS releases in even-numbered ones. Either way, .NET 12 is the November 2027 release and an LTS release.

What is not yet public, as of 21 November 2026:

  • An exact general availability date. Recent releases all landed on a Tuesday between 10 and 14 November: 14 November 2023 (.NET 8), 12 November 2024 (.NET 9), 11 November 2025 (.NET 10) and 10 November 2026 (.NET 11).
  • Any .NET 12 build. The dotnet/core release notes list folders up to 11.0 and nothing for 12.0.
  • A feature list. Anything you read about specific .NET 12 features today is speculation.

The .NET 11 cycle shows what the next twelve months are likely to look like. Preview 1 shipped on 10 February 2026, followed by monthly previews to Preview 7 on 11 August, three release candidates between 8 September and 25 October, and general availability on 10 November 2026. If .NET 12 follows the same rhythm, expect Preview 1 around February 2027 and the first release candidate around September 2027. Release candidates are normally go-live builds, which Microsoft supports in production; previews are not supported.

Is .NET 12 an LTS release?

Yes, under the current policy. LTS releases get three years of support and STS releases get two, and Microsoft says the two differ only in support length, with the same engineering, security and compatibility process for both.

The STS length changed recently. In September 2025 Microsoft extended STS support from 18 to 24 months, starting with .NET 9, so an STS release now ends 12 months after its successor ships. The reason given was out-of-band packages: a team that wanted to stay on LTS could pull in a component that depends on a newer STS-versioned package and end up with a shorter support window for part of its app. One side effect is that consecutive LTS and STS releases now end on the same day. .NET 8 and 9 ended together on 10 November 2026, and .NET 10 and 11 will end together on 14 November 2028.

Microsoft Learn describes LTS support as at least three years, or one year after the next LTS release ships if that is later. For .NET 10, that means support ends about a year after .NET 12 arrives.

.NET support dates on 21 November 2026

The table uses the support policy page and the releases index, both checked on 21 November 2026. The .NET 12 row is our projection from the published cadence.

Version Type Released Latest patch End of support Status today
.NET 8 LTS 14 November 2023 8.0.34 10 November 2026 Out of support
.NET 9 STS 12 November 2024 9.0.23 10 November 2026 Out of support
.NET 10 LTS 11 November 2025 10.0.15 14 November 2028 Active
.NET 11 STS 10 November 2026 11.0.0 14 November 2028 Active
.NET 12 LTS (expected) November 2027 (expected) None yet About November 2030 (expected) Not released

Two details are worth noting. First, the .NET 10 launch post in November 2025 gave 10 November 2028 as its end date, but the policy page and the dotnet/core release notes now list 14 November 2028, the second Tuesday of that month. Use 14 November 2028. Second, end-of-support dates fall on a Patch Tuesday: Microsoft takes the closest Patch Tuesday from the three-year mark, so the exact .NET 12 date will be set the same way.

The last six months of any release are a maintenance phase with security fixes only. For .NET 10 that phase starts in May 2028, which is another reason not to leave the .NET 12 move to the final quarter.

What .NET 8 end of support means right now

.NET 8 apps keep running after 10 November 2026, but Microsoft no longer ships security fixes or offers technical support for them. The final 8.0.34 and 9.0.23 patches shipped on that date. Microsoft's end-of-support notice advises retargeting to .NET 10, and says a future Visual Studio 2022 servicing update will mark the .NET 8 and 9 components as out of support. Our piece on .NET 8 and 9 end of support covers the CVE exposure and the choice between .NET 10 and 11 in detail.

So the real question for a .NET 8 team is not whether to wait for .NET 12. Waiting means running unpatched for about a year. Move to .NET 10 now, then treat .NET 12 as a routine LTS-to-LTS step. Our companion analysis, .NET 10 vs .NET 12: upgrade now or wait, works through that decision.

Which path fits your app

Starting point Recommended path Timing Why
.NET 8 or 9 Move to .NET 10 now Before the next Patch Tuesday, 8 December 2026 Already out of support
.NET 10, LTS-only policy Stay on 10, then go to 12 First half of 2028 One upgrade, three years of support from 12
.NET 10, wants C# 15 features Move to 11, then to 12 11 now, 12 in 2028 11 ends the same day as 10, so no support is lost
.NET 11 Plan for 12 Within 12 months of .NET 12 launch 11 ends 14 November 2028
.NET Framework 4.x Port to .NET 10 Scoped project Larger rewrite, separate lifecycle

The .NET 11 option deserves a closer look than it used to get. Under the old 18-month STS rule, picking an odd-numbered release cut your support short. Now .NET 11 runs to the same 14 November 2028 as .NET 10, so a team that wants C# 15 union types or the newer ASP.NET Core features loses no support time by moving to 11. Our guide to C# 15 union types in .NET 11 covers that language change. The trade-off is one extra upgrade in a two-year window.

Tooling you need before you start

Visual Studio. Targeting net10.0 is officially supported only in Visual Studio 2026 (version 18.0 and later), and targeting net11.0 only in version 18.12 and later. Visual Studio 2022 version 17.14 can run the first .NET 10 SDK but tops out at net9.0 as a target. .NET 12 will very likely need a later Visual Studio 2026 update, so keep build machines current. Our note on Visual Studio 2022 mainstream support ending on 12 January 2027 covers the IDE side.

SDK feature bands. The SDK ships feature bands such as 10.0.1xx and 10.0.4xx roughly quarterly, while Visual Studio 2026 ships monthly minor versions. Microsoft recommends installing the latest SDK even if it is an STS release, because it can target every supported runtime.

Upgrade tools. .NET Upgrade Assistant is officially deprecated. Microsoft now points to the GitHub Copilot modernization chat agent, included in Visual Studio 2026 and in Visual Studio 2022 17.14.16 or later, which builds a step-by-step plan and commits each change so you can validate or roll it back. The .NET 11 launch added the .NET Upgrade canvas, a visual view of an upgrade session that shows assessment findings, tasks, failures and progress. Treat it as an assistant: you still own the test run.

Step-by-step: .NET 8 to .NET 10 now

Microsoft's upgrade guide says the only required source change is the TargetFramework value; everything else is about tooling, packages and behaviour changes.

  1. Inventory. List every project, its target framework, hosting model (App Service, containers, Lambda, IIS, Windows service) and the SDK version on each build agent.
  1. Pin the SDK. Add or update global.json so every machine uses the same .NET 10 SDK, with a roll-forward policy you choose deliberately.
  1. Hold analyser rules steady. Set AnalysisLevel to your current version for the first pass, so new .NET 10 analyser warnings do not mix with real breakages.
  1. Retarget. Change net8.0 to net10.0 in each project file. Keep platform suffixes such as -windows where present.
  1. Update packages. Move Microsoft.* and EF Core packages to the 10.x line, then third-party packages. Run dotnet workload restore if you use workloads.
  1. Work through breaking changes. Read the .NET 10 list for your areas. Items that catch teams in practice include default container images moving to Ubuntu, OpenSSL 1.1.1 or later being required on Unix, BackgroundService running all of ExecuteAsync as a task, and null values now being preserved in configuration.
  1. Test under load. Run the full test suite, then a representative load test, and compare memory and latency with the .NET 8 baseline.
  1. Roll out in stages. Release to one environment or region first, watch error rates for a week, then complete the rollout.
  1. Remove the old runtime. Uninstall .NET 8 from servers and images once nothing depends on it, as the support policy recommends for out-of-support versions.

A sample global.json for the .NET 10 stage looks like this; replace the version with the current .NET 10 SDK on your agents.


            {
  "sdk": {
    "version": "10.0.100",
    "rollForward": "latestFeature"
  }
}
          

With latestFeature, a machine uses the newest installed .NET 10 SDK patch or feature band but stays on 10.x until you change the file.

Step-by-step: .NET 10 to .NET 12 in 2027 and 2028

The second hop is mostly scheduling. A suggested calendar, based on the .NET 11 cycle:

When What to do Output
February to August 2027 Track .NET 12 previews on a branch; do not ship them List of build breaks and package gaps
September to October 2027 Test the release candidates, which are go-live builds Go or no-go for each service
November 2027 .NET 12 launches; wait for the first patch Target date per service
December 2027 to June 2028 Migrate production services in waves All services on .NET 12
May 2028 .NET 10 enters its security-only maintenance phase Stragglers escalated
14 November 2028 .NET 10 and .NET 11 end of support Nothing left on 10 or 11

If you jump from .NET 10 straight to .NET 12, you absorb two years of breaking changes at once: the .NET 11 list and whatever .NET 12 adds. Read the .NET 11 list now. It already includes updated minimum hardware requirements for the JIT, saturating floating-point conversions to small integer types, correctly rounded Math.Round, IHost.RunAsync throwing when a background service fails, and, for mobile apps, CoreCLR replacing Mono with the minimum Android API level raised to 24. Microsoft labels that page a work in progress, so check it again before you start.

Two habits make the 2028 move cheaper. Keep the build warning-free on .NET 10, because obsoletion warnings in one release often become errors later. And run a scheduled CI job against the latest .NET 12 preview from Preview 1 onwards, so surprises surface in 2027 rather than in the final quarter.

India-specific considerations

Many Indian IT services firms and global capability centres maintain .NET estates under fixed-scope client contracts. If a contract specifies a framework version, raise the change now: .NET 8 is already out of support, and a second change request for .NET 12 will be needed during 2028. Budget both upgrades in the same conversation so the client sees one plan, not two surprises.

For teams that sell into regulated buyers, an unsupported runtime is an easy finding for an auditor to raise. Keeping the runtime on a supported LTS line, with monthly patches applied after each Patch Tuesday, is a simple control to evidence.

How eCorpIT can help

eCorpIT is a Gurugram-based technology organisation, founded in 2021, assessed at CMMI Level 5 and MSME certified, with senior-led engineering teams working across AWS, Microsoft and Google platforms. Our application development services team can run the .NET 8 to .NET 10 move now and plan the .NET 12 upgrade as a scoped, tested programme for 2028. Talk to us at /contact-us/.

Last updated: 21 November 2026.

References

  1. .NET and .NET Core official support policy — Microsoft
  1. Release policies — dotnet/core repository, Microsoft
  1. .NET release notes — dotnet/core repository, Microsoft
  1. .NET releases index (JSON) — Microsoft
  1. .NET 8 and .NET 9 will reach End of Support on November 10, 2026, 29 June 2026 — .NET Blog, Microsoft
  1. Announcing .NET 11, 10 November 2026 — .NET Blog, Microsoft
  1. .NET 11 release notes — dotnet/core repository, Microsoft
  1. .NET STS releases supported for 24 months, 16 September 2025 — .NET Blog, Microsoft
  1. Releases and support for .NET — Microsoft Learn
  1. Announcing .NET 10, 11 November 2025 — .NET Blog, Microsoft
  1. .NET 10 release notes — dotnet/core repository, Microsoft
  1. .NET SDK, MSBuild and Visual Studio versioning — Microsoft Learn
  1. What is .NET Upgrade Assistant? — Microsoft Learn
  1. Upgrade to a new .NET version — Microsoft Learn
  1. Breaking changes in .NET 10 — Microsoft Learn
  1. Breaking changes in .NET 11 — Microsoft Learn

Frequently asked

Quick answers.

01 When is .NET 12 released?
.NET 12 is due in November 2027. Microsoft ships a new major .NET version every November, and the last four launches fell on a Tuesday between 10 and 14 November. Microsoft has not announced an exact date or published a preview yet, so treat November 2027 as the planned month rather than a confirmed day.
02 Is .NET 12 an LTS release?
Yes, under Microsoft's current policy. Even-numbered .NET versions are Long Term Support releases with three years of free support and patches, so .NET 12 should be supported until about November 2030. Odd-numbered versions such as .NET 11 are Standard Term Support releases with two years of support.
03 When does .NET 10 support end?
.NET 10 support ends on 14 November 2028, according to Microsoft's support policy page and the dotnet/core release notes. The original launch post said 10 November 2028, but the policy now lists the second Tuesday of November. From May 2028, .NET 10 receives security fixes only, during its final six-month maintenance phase.
04 Is .NET 8 still supported?
No. .NET 8 reached end of support on 10 November 2026, with 8.0.34 as its final patch. Apps still run, but Microsoft no longer ships security fixes or offers technical support. .NET 9 ended the same day. Microsoft recommends retargeting to .NET 10, which is supported until 14 November 2028.
05 Should we wait for .NET 12 instead of upgrading to .NET 10?
No. Waiting would leave .NET 8 apps without security patches for about a year. Move to .NET 10 now, which is a supported LTS release, then plan the .NET 10 to .NET 12 move for the first half of 2028. Each step is smaller and easier to test than one large jump.
06 Why do .NET 10 and .NET 11 end on the same day?
In September 2025 Microsoft extended Standard Term Support from 18 to 24 months, so an STS release now ends 12 months after its successor ships. .NET 11 launched in November 2026, so it ends in November 2028, on the same Patch Tuesday as .NET 10, which runs three years from November 2025.
07 Which Visual Studio version do I need?
Targeting .NET 10 is officially supported only in Visual Studio 2026, version 18.0 or later, and targeting .NET 11 needs version 18.12 or later. Visual Studio 2022 is not supported for targeting .NET 10. Expect .NET 12 to need a later Visual Studio 2026 update, so keep developer machines and build agents current.
08 Is .NET Upgrade Assistant still the tool to use?
No. Microsoft has officially deprecated .NET Upgrade Assistant and points to the GitHub Copilot modernization chat agent in Visual Studio 2026 and Visual Studio 2022 17.14.16 or later. It analyses projects, builds a migration plan and commits each change separately, but your own tests still decide whether the upgrade is safe to ship.

About the author

Manu Shukla

Founder & Director

Founder of eCorpIT. Hands-on engineer leading senior-only delivery for AI apps, custom software, and cloud systems for global clients.

Subscribe

One engineering note a week. No fluff, no spam.

Senior-architect playbooks on AI agents, mobile apps, cloud, security, data, and marketing — delivered every Wednesday.

Past the reading

Read enough. Let's build something.

A senior architect responds in 24 working hours with scope, indicative cost, and a timeline. NDA before any technical conversation.

Loading search…

Browse all guides